Table 2. Cost factors and assumptions used for operation cost analysis.

Cost factor Operation machine
Extraction Chipping Screening
Excavator with wood grapple Forestry tractor Drum type chipper Rotary screen Excavator with bucket loader
Price (won) (P) 57,700,000 247,500,000 246,000,000 126,000,000 130,000,000
Endurance perioda (years) (N) 7 10 5 10 7
Economic life (hour) (H) 9,744 13,920 6,960 13,920 9,744
Annual operation timeb (hour) (J) 1,392 1,392 1,392 1,392 1,392
Fuel consumption (liter/hour) (c) 5.0 28.5 - 4.4 8.0
Coefficient of repair and maintenance (r) 0.8 0.8 0.8 0.9 0.8
Coefficient of lube oil (l) 0.4 0.4 0.4 0.2 0.4
Interest rate (%/year) (i) 10 10 10 10 10
Depreciation (won/hour) P/H or P(N·H) 5,922 17,780 35,345 9,052 13,342
Interest expense (won/hour) 0.5·P·i·0.01/J 2,073 8,890 8,836 4,526 4,670
Costs of repair and maintenance (won/hour) P/H·r 4,737 14,224 28,276 8,147 10,673
Fuel costc (won/hour) c·l·(1+0.1) 9,219 52,548 - 8,113 14,750
Other cost (won/hour, Insurance, storage fee etc.) - 83 249 495 127 187
Sub total - 22,033 93,692 72,952 29,964 43,622
Labor costd (won/hour, 50% Inclusion incidental expense) - 47,843 47,843 - - 47,843
Total machine cost (won/hour, Inclusion labor cost) - 69,877 141,535 72,952 29,964 91,465
214,487 121,428
174 day × 8 hour=1,392 hours (Korea Forest Service, 2012)
Endurance period (Miyata, 1980; Woo et al., 1997; Brinker et al., 2002)
Diesel : 1,317 won/liters in 2021, South Korea (Korea National Oil Corporation, 2021)
Standard of labor cost: machine operator (212,637 won/day) (Construction Association of Korea, 2021)