Standard work applied Unit Qty.
< 10° 10∼15° 15∼20° 20∼25° 25∼30° ≧ 30°
Earth works
   Cutting m3 279 798 1,094 1,511 1,834 1,834
   Filling m3
   Carrying sediment m3
   Remained cut-wall slope grading m3
   Soil covering on terrace m3
Slope stability works
   Boulder stacking m2 63 63 94 94 124
   Underground laying structur) ea 2 2 4 6
   Stone masonry on hillside m 31 31 63 63 94 124
   Terrace sodding m 31 63 63 63 94
   Vegetation sack stacking m 31 31 63 94 94
Slope greening works
   Seeding m2
   Slope mulching m2 1,116 3,192 4,338 6,046 7,336 7,336
   Tree planting tree 4,000 4,000 4,000 4,000 4,000 4,000
   Sod planting m2 279 798 1,084 1,511 1,834 1,834
   Seed-fertilizer-soil mixed spraying m2
Drainage works
   Concrete channel m 31 31 63 63 94
   Sod channel m 81 124 155 186 248 310
   Stone channel m 112 119 124 130 134 184
   Water collecting well ea 1 1 1 1 1 1
   Rill control by sod ea 5 10 20 30 40 60
   Rill control by stone ea
   Sediment retarding basin ea 1 1 1 1 1 1