Soil depth(cm) / Soil hardness (kgf/cm3) | Normal site (control site) | Tensile crack on the top | Tensile crack in the bamboo field | Groundwater spill point | ||
---|---|---|---|---|---|---|
1 | 2 | 1 | 2 | |||
0 | 0.5 | 0.5 | 0.2 | 0.3 | 0.2 | 0.3 |
5 | 9.0 | 4.5 | 0.2 | 0.3 | 0.2 | 0.3 |
10 | 9.0 | 10.6 (9.0 cm) | 0.2 | 5.2 | 2.0 | 13.0 (8 cm) |
15 | 12.5 (12 cm) | 0.2 | 9.6 (14 cm) | |||
20 | 0.2 | |||||
25 | 0.2 | |||||
30 | 0.2 | |||||
40 | 3.0 | |||||
50 | 2.5 | |||||
60 | 3.2 (55 cm) | |||||
Soil depth (cm) | 12 | 9.0 | 55 | 14 | 10 | 8 |