A(Good, repair if necessary) | < 30 | Good condition without any problems such as deformation or damage |
B(Repair) | 30 ≤, < 70 | Condition in which some defects have occurred, but there is no hindrance to the functioning of the facility, and some repairs are required |
C(Reinforcement or improvement) | 70 ≤ | Condition in which urgent reinforcement or improvement is required due to a decrease in the function of the facility and an abnormality in safety management by the occurrence of a serious defect |
D(Safety diagnosis) | 70 ≤ | Condition in which unsafety is expected due to a serious defect, but additional safety diagnosis is required because it is insufficient to suggest countermeasures at the level of detailed inspection |
E(Additional construction or re/replacement construction) | 70 ≤ | Condition in which additional construction or re/replacement construction is required when it is impossible to supplement or improve construction, or it is economically inefficient, even when serious defects are found |