Table 11. Distribution for delay time in processing operation by stroke harvester.

Classification Pinus rigida Quercus mongolica
Time, sec Rate, % Time, sec Rate, %
Personal delay time Rest - - 92 2.0
Talking of operation 130 3.9 - -
Total 130 3.9 92 2.0
Operation delay time Waiting 2,159 64.9 2,348 49.8
Cleaning around the stump 442 13.3 114 2.4
Check up the lengh of logs 192 5.8 - -
Collection of timber 30 0.9 598 12.7
Cleaning of timber - 0.0 182 3.9
Total 2,823 84.9 3,242 68.7
Mechanical delay time Repair chain-saw 372 11.2 605 12.8
Grease injection into the machine - - 778 16.5
Total 372 11.2 1,383 29.3
Total delay time 3,325 100.0 4,717 100.0