Table 5. Cost factors and assumptions used for operation cost analysis.

Cost factor Machine
Excavator Head
Price (won) (P) 110,000,000 110,000,000
Endurance perioda (years) (N) 7 8
Economic life (hour) (H) 9,744 11,136
Annual operation timeb (hour) (J) 1,392 1,392
Fuel consumption (liter/hour) (c) 12.8 9.0 16.8 -
Coefficient of repair and maintenance (r) 0.8 0.8
Coefficient of lube oil (l) 0.4 0.4
Interest rate (%/year) (i)1 10 10
Depreciation (won/hour) P/H or P(N·H) 11,289 9,878
Interest expense (won/hour) 0.5ㆍPㆍiㆍ0.01/J 3,951 3,951
Costs of repair and maintenance (won/hour) P/Hㆍr 9,031 7,902
Fuel costc (won/hour) cㆍlㆍ(1+0.1) 28,063 19,732 36,832 -
Other cost (won/hour, Insurance, storage fee etc.) - 158 138
Sub total - 52,492 44,161 61,262 21,870
Labor costd (won/hour, 50% Inclusion incidental expense) - 43,064 -
Total machine cost (won/hour, Inclusion labor cost) - 95,556 87,225 104,326 21,870
117,426e 109,095f 126,196g
174day×8hour=1,392hours (Korea Forest Service, 2012)
Endurance period (Miyata, 1980; Woo et al., 1997; Brinker et al., 2002)
Diesel : 1,566won/liters in 2022, South Korea (Korea National Oil Corporation, 2022)
Standard of labor cost: machine operator (229,676won/day) (Construction Association of Korea, 2022)
Machine cost of felling and processing operation,
Machine cost of felling operation,
machine cost of processing operation