Table 6. Productivity in felling and processing operation by stroke harvester.

Classification Items Value
Pinus rigida Quercus mongolica
Observed value The number of felling and processing (cycle) 43 39
The number of timber felling and processing (tree) 43 39
The volume of timber felling and processing (m3) 19.35 8.11
Felling and processing times (sec) 9,099 8,306
Number of operator (man) 1 1
Average per cycle The volume of timber felling and processing (m3/cycle) 0.45 0.21
Felling and processing time (sec/cycle) 303 213
Average per hour The number of felling and processing (cycle/hour) 15.37 25.17
The volume of timber felling and processing (m3/hour) 6.53 4.02
Average per day The number of felling and processing (cycle/day) 122.97 201.34
The volume of timber felling and processing (m3/day) 52.25 32.12
Note) Productive time per day is 8 hours.