Table 8. Productivity in felling operation by stroke harvester.

Classification Items Value
Pinus rigida Quercus mongolica
Observed value The number of felling (cycle) 80 29
The number of timber felling (tree) 80 29
The volume of timber felling (m3) 34.35 9.28
Felling times (sec) 5,233 2,946
Number of operator (man) 1 1
Average per times The volume of timber felling (m3/cycle) 0.43 0.32
Felling time (sec/cycle) 65 102
Average per hour The number of felling (cycle/hour) 96.1 75.1
The volume of timber felling (m3/hour) 40.9 23.0
Average per day The number of felling (cycle/day) 768.8 600.8
The volume of timber felling (m3/day) 327.4 183.7
Note) Productive time per day is 8 hours.