Table 5. Average cycle time by work elements in yarding and processing of single and multi operations.

Classification Single operationc (n=95) Multi operationd (n=104)
sec % sec %
Yardinga,b Carriage out 35 6.7 24 8.2
Lateral out 128 24.4 56 19.5
Hook 129 24.7 36 12.7
Lateral in 34 6.5 27 9.6
Carriage in 29 5.6 30 10.6
Unhook 20 3.9 25 8.7
Delay 149 28.3 88 30.7
Total cycle time 525 100.0 287 100.0
Delay-free cycle time 376 - 199 -
  Single operationa (n=173) Multi operationb (n=104)
Processing Moving - - 10 4.6
Processing 114 46.1 110 50.2
Log bunching 11 4.4 22 10.0
Residues bunching 16 6.6 6 2.7
Delay 105 42.8 71 32.4
Total cycle time 246 100.0 219 100.0
Delay-free cycle time 141 - 148 -
set-up and displacement time : (single) 3h30m, (multi) 5h10m
Number of trees per cycle : (single) avg. 2 (min. 1, max. 4), (multi) avg. 1
Utilization : Yarding (71.6%), Processing (56.9%),
Utilization : Yarding (69.3%), Processing (69.1%)