Classification | Yarding | Processing | Note | |||||
---|---|---|---|---|---|---|---|---|
PMH | SMH | PMH | SMH | (Set-up and displacement time) | ||||
Single operation | Productivity (m3/hr) | 11.0 | 7.9 | 14.2 | 8.1 | (None) | ||
6.3 | (3 h 30 m) | |||||||
Utilization (%) | 71.7 | 56.9 | (None) | |||||
57.0 | (3 h 30 m) | |||||||
Multi operation | Productivity (m3/hr) | 9.5 | 6.6 | 12.6 | 8.7 | (None) | ||
4.6 | (3 h 30 m) | |||||||
4.0 | (5 h 10 m) | |||||||
Utilization (%) | 69.3 | 69.1 | (None) | |||||
48.5 | (3 h 30 m) | |||||||
42.7 | (5 h 10 m) |