Table 7. Productivity in yarding and processing of single and multi operations.

Classification Yarding Processing Note
PMH SMH PMH SMH (Set-up and displacement time)
Single operation Productivity (m3/hr) 11.0 7.9 14.2 8.1 (None)
6.3 (3 h 30 m)
Utilization (%) 71.7 56.9 (None)
57.0 (3 h 30 m)
Multi operation Productivity (m3/hr) 9.5 6.6 12.6 8.7 (None)
4.6 (3 h 30 m)
4.0 (5 h 10 m)
Utilization (%) 69.3 69.1 (None)
48.5 (3 h 30 m)
42.7 (5 h 10 m)